— Proven in production
The results infrastructure teams get with Digital Rebar
Real bare-metal automation outcomes from banks, gaming leaders, and service providers — measured in dollars saved, hours returned, and risk removed.
Featured story
- BANKING & ENTERPRISE
Bare-metal VMware vCenter lifecycle accelerates time to market
A multi-national bank cut VMware Cloud Foundation cluster deployment from six months on the datacenter floor to sixty minutes — while normalizing vendors to unlock reverse-auction pricing leverage across thousands of servers.
Case study library
Find the proof that matches your stack
Filter by industry or challenge. Read online in seconds, or download the full PDF.
- High-Frequency Trading
Hardware configuration boosts infrastructure resilience
96% quicker delivery-to-in-use time
77% less vendor-locked infrastructure
Wks → validation offloaded to vendors
- Gaming & High-Scale Ops
Faster server deployments increase team productivity
4k+ on-premises servers managed
5+ operating systems supported
30 → 5 min per server, manual to automated
- Managed Services (MSP)
Enhancing ESXi provisioning efficiency for a leading provider
−80% in number of operations interfaces
+33% workflow success rate
75 low site-to-site variation
- Media & CI/CD Pipelines
Bare-metal integration revolutionizes CI/CD workflow efficiency
96% reduction in manual effort
99.9% reliability of second run
IaC fully reproducible pipelines
- Data Acceleration & R&D
How Plops streamlines bare-metal provisioning and testing
20+ OS images available on demand
100% integration with existing tooling
160 servers across every major vendor
- BANKING & ENTERPRISE
Bare metal VMware vCenter lifecycle accelerates time to market
16k servers managed
15x faster deployment
6mo → 60m to fully operational clusters
- High-Frequency Trading
Hardware configuration boosts infrastructure resilience
96% quicker delivery-to-in-use time
77% less vendor-locked infrastructure
Wks → validation offloaded to vendors
- BANKING & ENTERPRISE
Bare metal VMware vCenter lifecycle accelerates time to market
16k servers managed
15x faster deployment
6mo → 60m to fully operational clusters
- Gaming & High-Scale Ops
Faster server deployments increase team productivity
4k+ on-premises servers managed
5+ operating systems supported
30 → 5 min per server, manual to automated
- Managed Services (MSP)
Enhancing ESXi provisioning efficiency for a leading provider
−80% in number of operations interfaces
+33% workflow success rate
75 low site-to-site variation
- Media & CI/CD Pipelines
Bare-metal integration revolutionizes CI/CD workflow efficiency
96% reduction in manual effort
99.9% reliability of second run
IaC fully reproducible pipelines
- Data Acceleration & R&D
How Plops streamlines bare-metal provisioning and testing
20+ OS images available on demand
100% integration with existing tooling
160 servers across every major vendor
Get all six case studies in one pack
One download. Every metric, challenge, and outcome — ready to share with your team or build the business case.
- $10M+ savings breakdown from the banking deployment
- ESXi, VCF, and bare-metal automation playbooks
- Real quotes from infrastructure leaders
Download the proof pack
Instant access — embed via HubSpot Content Hub
We’ll email the PDF and occasional product updates. Unsubscribe anytime.